vishwagurubhar Profile Banner
shashwat3852 Profile
shashwat3852

@vishwagurubhar

Followers
1K
Following
2K
Media
319
Statuses
2K

Real estate ● Infrastructure ● उत्तरं यत्समुद्रस्य हिमाद्रेश्चैव दक्षिणम् । वर्षं तद् भारतं नाम भारती यत्र संततिः ।।.

ब्रह्मणः एव निवासे
Joined May 2022
Don't wanna be here? Send us removal request.
@vishwagurubhar
shashwat3852
3 months
INDIA'S HSR: Long thread.Understanding how india can Built one of the world's advanced HSR system. Let's start with understanding china and EUs game. Out of 48000 KM HSR network china only has 10000 greenfield rest are track upgrades which are much easier to do. (1/n)
Tweet media one
Tweet media two
@sibalsahab
Coach Rajan
3 months
India needs 48000 years to built this network.
18
158
1K
@vishwagurubhar
shashwat3852
1 day
-Cluster development is an art, and the Hudson Yards project is its Picasso. -This masterpiece can be replicated with our own version in Bayback, Colaba, spread across 45 acres. -Shapoor Pallonji has permission to construct a 306-meter skyscraper on 3 acres of this land
Tweet media one
Tweet media two
Tweet media three
6
10
153
@vishwagurubhar
shashwat3852
2 days
First of all, just a pre feasibility stage has been planned. There are different geographical conditions between maharashtra and Japanese regions. This reading is to understand the engineering marvels of the project and taking note of future concerns, not taking risks.
0
0
12
@vishwagurubhar
shashwat3852
2 days
4. How was the plan made?.Chubu Centrair Airport Location: Built on an artificial island in Ise Bay near Nagoya, Japan, opened in 2005. Island Creation: Used 60 million cubic meters of soil and rock to form the island, protected by strong concrete and steel seawalls. Stable.
0
0
23
@vishwagurubhar
shashwat3852
2 days
3. Kansai International Airport’s sinking issues taught Japan key lessons for future airport construction. Chubu Centrair International Airport, opened in 2005 near Nagoya, used these lessons by selecting more stable ground. Engineers at Chubu Centrair ensured essential systems
Tweet media one
0
3
28
@vishwagurubhar
shashwat3852
2 days
2. Kansai International Airport (KIX), built on artificial islands in Osaka Bay, Japan, connects over 30 million passengers yearly to 91 cities in 25 countries. Opened in 1994, it was designed to float on soft clay but is sinking, dropping 12 meters in its first 8 years. As of
Tweet media one
0
3
48
@vishwagurubhar
shashwat3852
2 days
As reported by @BHiren, if Vadhvan Airport plans to become an offshore airport in the future, there are valuable lessons to be learned from:.-Chubu International Airport.-Kansai International Airport in Japan. (1/4) . Read below for more details:
Tweet media one
13
47
546
@vishwagurubhar
shashwat3852
3 days
The Dharavi Redevelopment Project, the world’s costliest real estate venture at $36 billion, could transform Mumbai like Hudson Yards did for New York. Read Further:-. -Hudson Yards added $19 billion to New York’s GDP; Dharavi could contribute $70 billion to Mumbai. -Dharavi
Tweet media one
Tweet media two
14
66
569
@vishwagurubhar
shashwat3852
3 days
Thanks for the info:- @Jitskuhad.
1
0
4
@vishwagurubhar
shashwat3852
3 days
As @RahulChels is on a vacation, Let Me update with slum series. Valor Estate and L&T will soon Nuke a 7.5-acre slum in Bandra Reclamation under an MHADA/SRA redevelopment project. The project includes:.-A Waldorf Astoria luxury hotel and residences on a 1.5-acre land parcel.
Tweet media one
Tweet media two
Tweet media three
3
9
115
@vishwagurubhar
shashwat3852
4 days
The Next Big real estate Projects in Mumbai time light are Gonna be Redevelopment of Mhada colonies in Adarsh Nagar, worli and Bandra reclamation. 1: Bandra Reclamation, Aims to Redevelop 52 buildings accross 98 acres, benefitting around 1631 family. 2. Adarsh Nagar, worli:
Tweet media one
Tweet media two
3
26
174
@vishwagurubhar
shashwat3852
6 days
A Lite Metro might be the best choice for the options available. For more info on Lite Metro;-.
@haldilal
Haldilal
7 days
At BKC Light Metro system was shunned an lowest capacity Pod Taxi chosen due concern of lager pillars on narrow medians, there is solution a Light system with pillar at distance of 200 meter apart and not standard 15 - 30 meter made of entirely steel frame by hybrid construction.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
0
15
@vishwagurubhar
shashwat3852
6 days
While there were initial plans for a 9.25KM monorail system in Bandra Kurla Complex (BKC), specifically from Kala Nagar to the Bharat Diamond Bourse and then to Bandra (East) station, these plans were ultimately scrapped by the MMRDA, Due to Lack of Original equipment
Tweet media one
0
1
16
@vishwagurubhar
shashwat3852
6 days
Double-decker trams: BKC currently faces space constraints. Previously, attempts to create dedicated lanes for double-decker buses failed due to a lack of citizen discipline. At-grade trams can achieve a capacity of 11,480–18,000 passengers per hour per direction. While they
1
2
21
@vishwagurubhar
shashwat3852
6 days
A lite metro, with a passenger capacity of 32,000–72,000 per hour, can seamlessly connect Metro Line 3 (BKC station), planned Line 2B, and suburban stations in Bandra and Kurla. It’s the fastest alternative, as a full metro was deemed unfeasible due to BKC’s narrow road medians,.
3
4
45
@vishwagurubhar
shashwat3852
6 days
BKC currently has 6 crore sq.ft. of commercial space with 3 lakh daily travelers, a number likely to double with the Mumbai Metro Aqua Line connecting to Line 2B and MAHSR activation. The PRT system's 5,740 passengers per hour capacity is insufficient to reduce traffic congestion
Tweet media one
13
38
306
@vishwagurubhar
shashwat3852
8 days
Further: mumbai 3.0 will also includes medi city and sports city, but no plan has been released for that. 📸 credit:- @haldilal.
0
5
31
@vishwagurubhar
shashwat3852
8 days
10. Brookfield signed a 12B dollar mou with MMRDA in davos for infrastructure development in MMR. This will further be directed to KSC town for development and residential and commercial real estate and along with global capability, logistics and Data centre.
Tweet media one
1
4
33
@vishwagurubhar
shashwat3852
8 days
9. Investments from blackstone and brookfield:.Blackstone: 5b dollars will be directed towards KSC town for development of residential/ commercial/ Infrastructure and retail spaces. It also buildinh India's largest data centre with panschil realty with iNVST of 24000 crores.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
6
41
@vishwagurubhar
shashwat3852
8 days
8. Adani's 1000 acre township:.Adani realty invest rs 10000 crore in this township featuring Commercial/ Residential/ Retail developments. The investment is double of what Adani realty invested in Shanti gram.
Tweet media one
2
3
42
@vishwagurubhar
shashwat3852
8 days
7. Innovation city: a 300 acre innovation city as well a Global capability center( GCC) is to set up in NAINA. This city will mostly comprise of Data and AI centre developments. CM fadnavis vision is to replicate similar to GIFT city with high financial incentives to Co's.
Tweet media one
1
4
51