Had a few DMs off the back of this tweet asking about our pitch. The pitch was built in 1993, had primary drainage installed in 2010, it doesn’t have a gravel carpet and was stitched in 2022 into the existing profile at a depth of 140mm. Pictures attached are 3 yrs apart.