RefondOpto Profile Banner
Refond Optoelectronics Profile
Refond Optoelectronics

@RefondOpto

Followers
18
Following
484
Media
292
Statuses
511

Refond Optoelectronics Co., Ltd. is a world-renowned innovative technology company that integrates R&D, production and sales of LED application solutions.

Shenzhen, Guangdong, China
Joined June 2023
Don't wanna be here? Send us removal request.
@RefondOpto
Refond Optoelectronics
6 days
— Light That Moves With You, Safety That Stays With You — 🎄✨ Wishing you a bright, safe, and innovative Christmas. #Christmas #SmartLighting #ADB #AutomotiveLighting #Refond #SafeMobility
0
0
1
@RefondOpto
Refond Optoelectronics
6 days
Christmas lights up the road ahead. 🎄✨ This season, Refond's Micron-Level Pixel ADB Matrix Light Source delivers intelligent illumination that moves with you—bringing precision, safety, and warmth to every journey.
1
0
1
@RefondOpto
Refond Optoelectronics
8 days
🎁 From cozy Christmas décor to dynamic RGB effects, Refond helps you create lighting experiences that feel magical — all year round. 🎅💡 Wishing you a bright, colorful, and joyful Christmas! #Refond #LEDStrip #NeonLighting #ChristmasLights #FestiveLighting #RGBLighting
0
0
1
@RefondOpto
Refond Optoelectronics
8 days
• Ultra-small size with smooth, continuous illumination — no visible light spots • IP65 waterproof with resistance to salt, chemicals, UV, and corrosion • V0 fire rating, easy installation, and high reliability
1
0
1
@RefondOpto
Refond Optoelectronics
8 days
🎄✨ Light Up the Season with Refond LED Strip Solutions ✨🎄 This Christmas, let every space shine with warmth, color, and creativity. Refond LED Strip Products bring festive brilliance to indoor & outdoor scenes🌟
1
0
1
@RefondOpto
Refond Optoelectronics
9 days
🚗 As displays move from scale-driven to value-driven growth, Refond—an early Mini LED pioneer—continues to advance #MiniLED backlight and direct-view solutions, with a strong focus on automotive lighting, displays, and intelligent cockpit applications.
0
0
1
@RefondOpto
Refond Optoelectronics
9 days
🤝 The CMMA New Display Industry Exchange was held at #Refond, bringing industry partners together to explore the future of Mini/Micro LED (MLED).
1
0
1
@RefondOpto
Refond Optoelectronics
15 days
🔹 High reliability for demanding automotive environments From COB white / blue light with dispensing to advanced molding solutions, Refond enables customized, ultra-slim backlight designs that elevate cockpit displays across all automotive applications.
1
0
1
@RefondOpto
Refond Optoelectronics
15 days
🔹 AEC-Q102 automotive-grade certified 🔹 Ultra-thin 0OD AM solutions (White & Blue Light) 🔹 High luminous efficacy & excellent uniformity 🔹 Low halo effect with enhanced image quality 🔹 3D reflective optical structure 🔹 Integrated COBW module design
1
0
0
@RefondOpto
Refond Optoelectronics
15 days
Refond's Mini LED automotive backlight solutions deliver up to 2000 nits ultra-high brightness, exceptional contrast, and precise pixel-level local dimming, ensuring clear, vivid visibility even under strong ambient light—while maintaining optimal power efficiency.
1
0
0
@RefondOpto
Refond Optoelectronics
15 days
💡 Sharper visuals. Thinner designs. Automotive-grade reliability. 🚗✨ Mini LED Automotive Backlight Display Solutions | Refond Redefining in-vehicle visual experiences with ultra-thin, high-performance Mini LED technology.
1
0
1
@RefondOpto
Refond Optoelectronics
20 days
From ambient light to grille display and interactive taillight, Refond's solution turn light into a powerful communication medium—enabling vehicles to “speak” with clarity and intelligence. 💡 Interactive lighting, reimagined. Driving smarter, safer, and more expressive mobility
0
0
1
@RefondOpto
Refond Optoelectronics
20 days
🔹 Full-Color • Ultra-Uniform • Up to 16M Colors 🔹 Multiple Package Options 🔹 Flexible Pitch (P2.5–P4.0) for Seamless Integration 🔹 AEC-Q102 Qualified • Low Power 0.2W • Durable & Automotive-Grade 🔹 Supports customized icons, patterns, text, and dynamic effects
1
0
1
@RefondOpto
Refond Optoelectronics
20 days
Our interactive LEDs feature integrated LED–module design, full-color lighting expression, and high automotive reliability, enabling vivid animations and intelligent signaling across interior and exterior applications.
1
0
0
@RefondOpto
Refond Optoelectronics
20 days
✨ Refond Interactive Display LED Shaping the future of intelligent human–vehicle interaction. Evolves from simple illumination to dynamic communication, Refond delivers a new generation of display-driven lighting that enhances safety, personalization, and brand identity.
1
0
1
@RefondOpto
Refond Optoelectronics
21 days
🏆 A Moment of Honor | Refond Shines at the Hangjianet Display Annual Conference, Mini LED Backlight Solutions Win Two Major Awards #IMLS6 #AudiE5Sportback #Zeekr7X https://t.co/Ns2gRwpxP9
Tweet card summary image
medium.com
Innovation-Driven | Focus on Mini LED
0
0
1
@RefondOpto
Refond Optoelectronics
26 days
✨ Something bright is coming. Three months until Light + Building 2026. Frankfurt • March 8–13, 2026 Hall 8.0 • Booth F70 Stay tuned — the next chapter of light is about to unfold. #LB26 #LightAndBuilding #Refond #LightingInnovation
0
0
1
@RefondOpto
Refond Optoelectronics
28 days
🔹 Automotive-Grade Reliability MSL Level 2, Pb-free reflow compatible, RoHS & REACH compliant, and fully qualified to AEC-Q102. Lighting the road ahead with safer, smarter, and more durable headlamp solutions.
1
0
1