Markie 🇮🇪
@MarkAgitprop
Followers
6K
Following
12K
Media
2K
Statuses
11K
Dublin da. Northsider. Republican. Birdwatcher. Socialist.
Áth Cliath
Joined February 2011
Irish basketball team refuse to shake hands with Israeli team or, line-up with them at centre court for the national anthems, in protest at the genocide in Gaza and inflammatory and untrue comments made by Israeli players and staff about the Irish players
6K
24K
158K
Catherine Connolly, í buíoch,beannachtach,gealgháireach agus Gaelach os comhair na ndaoine i gCaisleán Bhaile Átha Cliath #Áras25 TG4
4
77
333
Spare a thought for the bulk of the media commentators and newspaper columnists who now need to patronisingly explain how Catherine Connolly’s landslide victory isn’t really reflective of the public mood on neutrality, housing, health foreign affairs, Irish unity, Gaeilge etc…
55
264
2K
Catherine Connolly has been elected the 10th President of Ireland.
3
2K
16K
Somebody please do a welfare check on the Sindo
☑️ | PROJECTION Ireland Votes is projecting that Catherine Connolly has won the Presidential election by a landslide. Connolly (IND) will be the 10th President of Ireland. LIVE results 🔗 https://t.co/S1ZAlbF3QM
#Ireland #Aras25 #Poll
0
0
19
Dublin North West final tally Connolly - 73.4% Humphreys - 18.8% Gavin - 7.9% 21% of overall votes were spoiled
4
12
59
Dublin South West, one third of boxes open: Connolly 63%, Humphreys 28.3%, Gavin 8.75%,
0
0
7
There’s a growing problem of foreign military intel services planting stories in Irish media, via compliant journos
37
143
853
On the day of the Presidential election - when neutrality has been a main campaign theme of Catherine Connolly’s campaign - @TodaywithClaire bring on a British military guest to scaremonger practically unchallenged about how neutrality is dangerous for Ireland. Unbelievable
22
66
279
FINAL POLL - President *Excluding Undecided Voters* Connolly (IND-Left): 55.7% (+6.4) Humphreys (FG): 31.6% (-2.6) Gavin (FF): 12.7% (-3.8) Via @REDCResearch
#Ireland #Poll
29
97
357
FINAL POLL - President Connolly (IND-Left): 44% (+8) Humphreys (FG): 25% (nc) Gavin (FF): 10% (-2) Unsure: 21% (-6) Via @REDCResearch
#Ireland #Poll
117
212
1K
In her time in the Dáil Heather Humphreys failed to speak up for people. She was so silent she didn’t even utter the words Housing Crisis in her entire time in government. What she did do was vote against motions to stop vulture funds buying mortgages without consent, against
Asked by @thejournal_ie if she declared her status as a credit union manager and defaults on mortgage cases when speaking in the Dail about repossessions or the tracker mortgage scandal, HH said: ‘I never stood up in the Dail and spoke about any of those things, I can assure you’
74
215
863
It literally took 60 seconds on the Oireachtas website to prove that her answer is untrue.
Asked by @thejournal_ie if she declared her status as a credit union manager and defaults on mortgage cases when speaking in the Dail about repossessions or the tracker mortgage scandal, HH said: ‘I never stood up in the Dail and spoke about any of those things, I can assure you’
4
131
779
Soon after the explosion in Rafah, I’m told by a source familiar, the White House and Pentagon knew that the incident was caused by an Israeli settler bulldozer running over unexploded ordnance — contradicting Netanyahu’s claim that Hamas had popped up from tunnels. After
Netanyahu reactivated his genocidal war on Gaza. His army conducted more than 100 air strikes since the morning and killed more than 30 Palestinian civilians. Netanyahu also activated his collective punishment of the civilian population blocking all humanitarian aid to Gaza.
868
10K
28K