Welcome to the official page of CCECC Nigeria Limited, Kaduna.

Kaduna, Nigeria
Joined November 2020
Don't wanna be here? Send us removal request.
@CCECCKADUNA
CCECC Kaduna
4 years
Update on construction of Kabala Costain to Aliyu Makama Road Barnawa with a 230m bridge by @CCECCKADUNA #KadunaUrbanRenewal Item of works: Lunching of final beam.
35
217
659
@CCECCKADUNA
CCECC Kaduna
5 days
Update on Rigasa Township Road: Item of works: Construction of concrete drainage at Ado Gwaram axis of the project.
6
59
107
@CCECCKADUNA
CCECC Kaduna
5 days
Update on completion of Nasarawa road to Flour mill. Item of work: continuation of earth works.
4
65
113
@CCECCKADUNA
CCECC Kaduna
5 days
Update on completion of Kabala road to Aliyu makama road Barnawa with Dual carriage bridge. Item of work: Continuation of Stone base works.
2
55
100
@CCECCKADUNA
CCECC Kaduna
8 days
Update on Construction of Kabala Road to Aliyu Makama Road, Barnawa, with Dual Bridge. Item of work: Laying of crushed stone base.
2
58
118
@CCECCKADUNA
CCECC Kaduna
9 days
Update on Construction of Kabala Road to Aliyu Makama Road, Barnawa, with Dual Bridge. As the rainy season is subsiding, the road is being cleaned and prepared to receive crushed stone base and asphalt immediately.
16
87
231
@CCECCKADUNA
CCECC Kaduna
10 days
Update on completion of Nasarawa to flour mill by @CCECCKADUNA. Item of work: removing of bad soil and replacing with good laterite material.
4
61
110
@CCECCKADUNA
CCECC Kaduna
13 days
Update on construction of Rigasa township roads: Excavation for Drainage commenced today at Ado-Gwaram section of the roads.
0
3
6
@CCECCKADUNA
CCECC Kaduna
14 days
Update on Completion of Nasarawa to Flour mill road by @CCECCKADUNA Item of work: Site clearance and scarification of existing asphalt.
1
1
4
@CCECCKADUNA
CCECC Kaduna
1 month
Update on construction of Rigasa township roads. Item of works: Site clearance and maintenance of the existing road to allow heavy-duty construction machines into the site at the Ado Gwaram section of the project.
6
24
30
@CCECCKADUNA
CCECC Kaduna
7 months
Update on Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Laying of crushed stone base course commenced today.
7
64
156
@CCECCKADUNA
CCECC Kaduna
9 months
Update on Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Laying of concrete kerbs (median separator) commenced today.
2
15
35
@CCECCKADUNA
CCECC Kaduna
10 months
Update on Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: laterite filling and conduct of Field Density Test for quality control.
4
28
79
@KawuGarba
Kawu Garba
10 months
Completion of Rabah road from Arewa house to Rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe bypass by @CCECCKADUNA #KadunaUrbanRenewal
0
5
17
@jibreelKhalil
JayB
10 months
Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Removal of Unsuitable soil and conduct of penetrometer test at old NDA section.
1
7
9
@NWali_X
Chief ๐Ÿ‡ต๐Ÿ‡ธ ๆ™บไบบ
10 months
If Uba Sani completes this overpass and the Barnawa/Kabala bridge, him winning Kaduna central is virtually assured. I hope he does something about the Nnamdi Azikwe express way, it's in such a palpable state.
@CCECCKADUNA
CCECC Kaduna
10 months
Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Removal of Unsuitable soil and conduct of penetrometer test at old NDA section.
1
6
19
@Waspapping_
Sarki.
10 months
Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Removal of Unsuitable soil and conduct of penetrometer test at old NDA section.
15
19
66
@dawisu
Peacock
10 months
This project when completed, will open up the entire area for new development, and make it alot easier to cross to bypass. Kudos Your Excellency @ubasanius ๐Ÿ‘Œ
@CCECCKADUNA
CCECC Kaduna
10 months
Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Removal of Unsuitable soil and conduct of penetrometer test at old NDA section.
5
18
86
@CCECCKADUNA
CCECC Kaduna
10 months
Completion of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Removal of Unsuitable soil and conduct of penetrometer test at old NDA section.
10
64
143
@CCECCKADUNA
CCECC Kaduna
1 year
Dualisation of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: linking of drainage at NDA yard to Nnamdi Azikwe underpass
1
17
62
@CCECCKADUNA
CCECC Kaduna
1 year
Dualisation of Rabah road from Arewa house to rigasa train station with overpass at Arewa house and Underpass At Nnamdi Azikwe byepass by @CCECCKADUNA #KadunaUrbanRenewal Item of work: Continuation of Drainage works .
0
7
16